In process design of creek reef to protect migrating fish and river banks from erosion in Alameda Creek Channel
publicsedimentoverall.png
publicsedimentlivingleveesection.png
publicsedimentlivingleveeelevation.png
Artificial creek reef prototype testing
Buoyant Ecologies research map of steelhead migration for Public Sediment
Resilient by Design, Public Sediment team mid-review design
Prototype geometries sketched by biologists, designed and fabricated by IBD students
Duplicate FRP prototypes fabricated by Kreysler and Associates to be tested in two sites
FRP prototypes deployed in Monterey Bay Harbor monitored by Benthic Lab marine biologists
Underwater monitoring of prototype plates
Proof of concept. Control plate on the left, contoured plate on the right
Time lapse images of prototypes
Presentation of Float Lab to the Port of Oakland for funding
Float Lab display at Material Innovation exhitibition
Pooling of water on Float Lab
6C2A4069.JPG
Site visit to Presidio Crissy Marsh with Presidio Trust biologists
inner marsh2.jpg
02_Ikeda_Margaret_floatlab speculation.jpg
03_Ikeda_Margaret_FloatLabexperiments.jpg
prev / next